+38 (067) 139-02-11
dismantling works
+38 (066) 066 63 47
road construction
excavation work

Dismantling of foundation

Dismantling of the foundation is one of the specialties of the construction company "Demontazhnik". A full range of services - from dismantling the foundation to the removal of construction waste.

Our services

  • Dismantling of concrete and reinforced concrete foundations.
  • Dismantling of monolithic foundations.
  • Dismantling of strip foundations.
  • Dismantling of bomb shelters, bunkers.
  • Removal and disposal of construction waste

Prices

A preliminary calculation of the price for dismantling the foundation is made on the basis of the following data:

  • type and base material of the foundation;
  • availability of engineering systems and communications;
  • remoteness from other buildings;
  • the volume of dismantling work - the size of the foundation and the depth of its occurrence.

The exact cost of dismantling is fixed in the estimate, which is the final price document.
For an accurate calculation, our specialist will visit your facility and take all the necessary measurements.

Price adjustments are carried out continuously, in order to avoid unpleasant situations, check prices with the manager!

Permits and licenses

LLC "Demontazhnik" carries out any dismantling work in accordance with the regulatory legislation - we have all the necessary permits for the types of work that affect the safety of capital buildings. Our quality management system is ISO certified. 

 

 

Order dismantling services and get professional advice
Call center opening hours: Mon-Sun from 7:00 to 21:00
+38 (067) 139-02-11

OUR ADVANTAGES

  • Our prices for dismantling foundations are below the market average.
  • Extensive experience in construction - our team has been successfully working in the construction market for over 10 years.
  • We are ready to perform the whole range of works - from dismantling to removal and disposal of construction scrap.
  • Consistently high quality - strict control at every stage and optimization of all processes allow us to carry out dismantling at a high level.

FOUNDATION DISMANTLING METHODS

  • Pneumatic tools. The cheapest technology. The essence of the method: the dismantling of concrete by crushing into smaller components with jackhammers and hydraulic hammers. Reinforced concrete fragments are cut with a diamond tool. In some cases, the use of this method for the demolition of the foundation is impossible due to strong vibrations, which are destructive to nearby buildings.
  • Hydrocline. Absolutely environmentally friendly method, no vibration. Quite expensive. Using diamond drilling, holes with a diameter of about 50 mm are made in reinforced concrete, into which the hydraulic wedges themselves are placed. The hydraulic station supplies the wedge cylinder with a pressure of about two thousand bar. Destructive elements, at the same time, develop an effort of about 400 tons.
  • Explosion. This is a cheap and effective method that requires a minimum of time. Special channels are drilled in the monolith, into which explosives are laid. This method is often not possible. Requires highly professional personnel who can perform complex engineering calculations.
  • Non-explosive destructive compositions. Eco-friendly, quiet, the safest and relatively inexpensive method. In specially prepared mines, chemical reagents are laid, which, in fact, destroy concrete structures. Nowadays, most NDKs (non-explosive destructive compositions) are made on a lime basis.
  • Ultrasonic dismantling method. Provides destruction of monolithic objects in strictly marked places, an extremely expensive method. The essence of the approach is that an ultrasonic wave is directed along the previously made planes.

When demolishing a foundation, they rarely use any technology in its pure form. Most often they are combined for optimal results.

The work is carried out in accordance with the selected technology. The procedure is as follows:

  • First, you need to inspect the location of the demolition, study the type of structure, building material.
  • After that, a work schedule is developed, their complexity and volume are assessed, and the most appropriate way to implement the task is selected.
  • This is followed by a direct analysis of the structure by the chosen method. The scheme is standard: the base must be crushed into fragments, and then the largest of them must be crumbled.
  • Upon completion of the technological operations, the resulting debris must be removed.

As a result, the site turns out to be completely ready for future development. Strict adherence to norms and standards is the basic principle of our business. We strive to eliminate possible risks when performing manipulations at the facility itself. The problem is solved with a minimum of inconvenience for the inhabitants of nearby buildings.

When performing work, you need well-coordinated work of professionals. Only then can it be guaranteed that the desired result will be obtained within the agreed time frame, without delays.