WITHOUT HOLIDAYS AND WEEKENDS 24/7
ALL OVER THE TERRITORY OF UKRAINE

Dismantling in Kyiv

If you are planning a renovation or reconstruction in the capital, the question of professional demolition comes first. The focus on demolition, demolition works helps save time, money, and nerves. This material includes a step-by-step process, safety requirements, permits, examples, estimated budgets, and a preparation checklist. The company LLC “BK Demontazhnik” performs works in Kyiv and the region, operates transparently, and provides full support.

What is demolition in Kyiv and when is it needed

Demolition KyivDemolition is the controlled dismantling of structures, engineering networks, and finishes in compliance with safety standards. In Kyiv, it is needed during major repairs, remodeling, reconstruction, or building demolition. There are two basic formats: partial demolition inside premises and full demolition of a building with its foundation.

When to order the service:

  • Before remodeling an apartment or office.
  • When replacing floors, screeds, window and door units.
  • To prepare spaces for new lease in shopping malls or business centers.
  • For demolishing unsafe or morally outdated structures.

The legal framework is regulated by building codes and occupational safety rules. For load-bearing walls, facades, floors, and external networks, project solutions and appropriate permits are required. Below is the complete process.

Turnkey process: from request to construction waste removal

Below is a typical workflow from LLC “BK Demontazhnik”. The turnkey format allows the client to avoid unnecessary coordination and downtime.

Stage 1. Site inspection and estimate

The manager accepts the request and agrees on a convenient time for inspection. An engineer visits the site, takes measurements, checks the structure, engineering systems, access, and logistics. Risks are identified: presence of load-bearing elements, hidden communications, noise restrictions, elevator and yard rules of the building.

Based on the results, an estimate is prepared. It contains a list of works with units of measurement, technology, required equipment, containers for construction waste, schedule, and cost. The client receives a fixed price for the agreed scope. Additional items are agreed separately.

Stage 2. Contract, work plan, and safety

A contract is signed with deadlines, guarantees, and responsibilities of the parties. A work execution plan is drawn up. Routes for waste removal, storage locations, and procedures for disconnecting electricity, water, and gas are specified. The team undergoes safety training. Personal protective equipment, spark protection for metal cutting, dust suppression, and local ventilation are included as standard.

Stage 3. Site preparation

Elevators, entrances, floors, and adjacent premises are protected. Temporary fences and warning signs are installed. Utility nodes are tested and sealed. In densely built areas of Kyiv, the noisy work schedule is coordinated with the property management company and neighbors. Containers for inert and mixed waste are placed on site.

Stage 4. Work execution

Two formats are used. Manual demolition is suitable for apartments and offices in occupied buildings where accuracy and minimal vibrations are important. Mechanical demolition with an excavator, hydraulic hammer, and loader is used at sites with building demolition, large debris removal, and hard materials. Selective dismantling is carried out: brick, concrete, metal, wood, glass. This reduces disposal costs and allows recycling.

Stage 5. Waste removal and acceptance

Construction waste is removed in 8–20 m³ containers or by truck crane. The site is cleaned. The client’s representative accepts the work by signing an act. If necessary, instrumental control is carried out, photo documentation is made, and execution documentation is handed over.

Types of demolition: private houses, structures of various purposes, business facilities, industrial demolition

Apartments and residential complexes

Typical tasks: dismantling partitions, screeds, gypsum board ceilings, tiles, doors, flooring, bathrooms. In high-rise buildings, noise and logistics rules are important. Industrial vacuum cleaners, double-layer bags, and protective floor coverings are used.

Private houses

Work includes dismantling the roof, rafter system, insulation, facades, floors, and partial foundation demolition. Perimeter fencing, crane work, and coordination for heavy machinery access are required.

Commercial spaces

Offices, retail, warehouses, production areas. Often this is dismantling of engineering systems: ventilation, electrical panels, distribution networks, refrigeration circuits. For shopping malls, the work plan is agreed with the mall management, and night work windows are scheduled.

Demolition, demolition works in Kyiv: what is included in the service

Full list: dismantling of finishes, structures, and engineering systems, concrete and metal cutting, selective dismantling of load-bearing elements according to the project, waste removal, cleaning, temporary fencing, work plan, safety briefing, and work completion certificates.

Safety, ecology, and law

Safety is a priority. The team works in PPE. The work area is fenced. For diamond cutting, water dust suppression is used. Safety briefing logs are kept. Waste is sorted. Hazardous fractions are handed over to licensed operators. It is useful to follow the city’s information on waste management. See the services section on the Kyiv City State Administration website.

Permits and approvals in Kyiv

For building demolition, interference with load-bearing structures and facades, project solutions and permits are required. In apartment buildings, remodeling must be agreed with the management company. On private sites, access for machinery and road closures must be approved if necessary. LLC “BK Demontazhnik” will advise which documents to collect and which project sections are mandatory.

Equipment and tools

  • Hand tools: rotary hammers, jackhammers, grinders, threading systems, vacuum cleaners.
  • Special equipment: skid steer loader, excavator with hydraulic hammer, truck crane, crane.
  • Technologies: diamond cutting, wire saws, non-impact opening cutting, dust-free demolition chemicals for brittle concrete.
Order dismantling services and get professional advice
Демонтажні роботи ведуться: WITHOUT HOLIDAYS AND WEEKENDS 24/7
Call center opening hours: Mon-Sun from 9:00 to 22:00
+38 (067) 215-88-88

How much it costs: price calculator

The price depends on:

  • Volume and type of materials.
  • Logistics of construction waste removal.
  • Need for special equipment and workers.
  • Work schedule and time windows.
  • Conditions for removal and disposal.

Approximate calculation model

ItemExample estimate
Walls, Partitions  from 200 UAH per m² depending on material
Screed from 200 UAH per m² with bag removal
Waste removal  from 300 UAH per m³ or per trip
Diamond cutting 6 linear m negotiable
Fencing, protection fixed amount
Cleaning fixed amount

After inspection, the engineer prepares an estimate and schedule. Fixing the price in the contract protects the client from unforeseen expenses within the agreed scope.

Timeframes and schedule

The duration of the work depends on the area, type of structures, access, and approvals.

ScopeTypical timeframe
Apartment 50–80 m² 2–5 working days
Office 200–400 m² 5–10 working days
Private house 120–200 m² 7–14 working days
Demolition of small structure 3–7 working days

Guarantees, contracts, insurance

The contract defines deadlines, cost, responsibilities, and guarantees. Certificates of completed work confirm the scope. If necessary, liability insurance is arranged. This is important for business facilities and dense urban areas.

Why LLC “BK Demontazhnik”

  • Full turnkey cycle in Kyiv and the region.
  • Work execution plan and safety requirements as standard.
  • Own special equipment or quick mobilization of partners.
  • Transparent estimate with no hidden fees.
  • Sorting and responsible disposal.
  • Accuracy in occupied buildings, protection of common areas.

Case 1. Demolition of a 350 m² office in a business center on the Left Bank. Night shifts, without stopping building operations. Corridors kept clean. Delivered one day ahead of schedule.

Case 2. Partial demolition of a 180 m² private building in the Darnytskyi district. Organized access for a truck crane, separate collection of bricks and metal. The site prepared for foundation work.

Common client mistakes

  • Hiring a team without project solutions for load-bearing walls.
  • No protection for elevators and removal routes.
  • Ignoring noisy work schedules in residential complexes.
  • No space for waste containers.
  • Delayed waste removal, blocking work progress.

Site preparation checklist

  1. Coordinate work and removal schedule with property management or homeowners association.

  2. Clear premises of furniture and equipment.

  3. Ensure access to electrical panels, valves, risers.

  4. Indicate access points and freight elevators.

  5. Confirm network connections or disconnections.

  6. Designate a place for temporary waste storage.

Post-demolition work

The service includes cleaning, wet dust removal, waste disposal, and basic surface preparation for new work. On request, initial edge reinforcement, coating waterproofing in wet areas, and chasing for new routes are performed.

DIY or Professional

CriterionDIYProfessional
Speed Low High
Quality Unstable Controlled
Safety High risks Procedures and PPE
Noise, dust Hard to control Reduction technologies
Legal issues On the client Handled by contractor
Total cost Often increases Predictable

Cases from Kyiv

  • Shopping mall, 600 m². Demolition of retail areas and engineering systems with night schedule. Mobile fencing, dust collection, and 20 m³ container used. Completed in 8 days.
  • Estate, 140 m². Dismantling roof and floors, partial opening cutting. Mini loader used, 12 m³ of inert waste removed. Pit prepared.

Summary table of services and rates

The figures are provided as guidelines. Exact price is determined after inspection and estimate.

ServiceUnitComment
Partition demolition Material and thickness affect price
Screed removal With carrying out and disposal
Diamond cutting linear m Openings in walls and floors
Construction waste removal Containers 8–20 m³
Small structure demolition object Special equipment involved
Cleaning and handover object Final cleaning and certificate

Frequently Asked Questions (FAQ)

Do I need permits for apartment demolition?
Yes, if it concerns load-bearing structures or facade. For finishes and non-load-bearing partitions, internal approval from the management company is usually sufficient.

Who removes construction waste and where does it go?
The contractor arranges containers and removal to landfill or recycling. Some fractions can be sent for reuse.

How to reduce dust and noise?
Use dust collection, water dust suppression, protective screens, and schedule night or day shifts in line with building rules.

How long does it take to demolish a standard two-room apartment?
Usually 2–4 working days, depending on volume and logistics.

How is the price fixed so it doesn’t increase during work?
A detailed estimate and contract are prepared. Additional volumes are agreed separately before execution.

Can demolition be combined with diamond cutting immediately for new openings?
Yes. This shortens deadlines and provides cleaner edges for new doors or engineering systems.

Conclusion and next steps

Demolition in Kyiv requires planning, safety, and clear logistics. Work with a contractor who provides a transparent estimate, work execution plan, and guarantees. LLC “BK Demontazhnik” performs turnkey work, ensures waste sorting, and accuracy in occupied buildings. Send the address, area, and photos to receive an estimate and schedule.